Kitchen Remodeling in Maryland

A kitchen remodel in Maryland shouldn’t mean three contractors pointing at each other. Sonny’s Renovations is a veteran-owned design-build firm in Fort Washington that handles your kitchen renovation end to end — designed layouts, custom cabinetry, stone counters, and tile, installed by the same crew from demo to final walk-through. One team, one contract, one warranty, across Maryland and Washington, DC.

What your kitchen remodel includes

  • Layout and design — concept drawings and material selections coordinated by one team, so the plan you approve is the kitchen you get.
  • Custom cabinetry — built and installed to your layout, not forced from a catalog.
  • Stone countertops and tile — templated, fabricated, and set by our crew.
  • Electrical, plumbing, and lighting — permitted and inspected, including island runs, under-cabinet lighting, and appliance circuits.
  • Structural changes — wall removals and open-concept conversions, engineered properly before demo day.

What kitchen remodeling costs in Maryland

Our kitchen remodels start around $8,000 for focused updates — counters, backsplash, paint-grade cabinet refresh — and run to full luxury builds with custom cabinetry, stone, and structural changes. Most full Maryland kitchen renovations land between $30,000 and $90,000 depending on size, cabinetry, and finishes. You get transparent pricing with financing options in our Budget step, before anything is demolished.

Our five-step process

Discover → Design → Budget → Permit → Build. We walk your kitchen and goals in a free consultation, design the layout and selections, price it transparently, pull the permits, and build it with one accountable crew. No handoffs, no finger-pointing.

Serving kitchens across Maryland and DC

From our home base in Fort Washington we remodel kitchens throughout Prince George’s County — Bowie, Upper Marlboro, Clinton, Accokeek, Fort Washington, Landover, Mitchellville, Indian Head — plus Waldorf and Southern Maryland, Montgomery County, and Washington, DC.

Kitchen remodeling FAQs

How long does a kitchen renovation take?

A focused update can be done in 2–3 weeks. A full gut kitchen remodel typically runs 6–10 weeks of construction after design and permits, depending on cabinetry lead times and structural scope.

Do I need a permit to remodel a kitchen in Maryland?

If the work moves plumbing, adds circuits, or touches structure — yes. We prepare and manage permits and inspections in every Maryland county we serve and in DC, as part of the job.

Can you open up a wall between my kitchen and living room?

Usually, yes. Load-bearing walls need an engineered beam — we evaluate feasibility during the free Discover visit and design the structure before demo, so there are no surprises mid-project.

Start your kitchen

Get a free consultation on your kitchen remodel anywhere in Maryland or DC. Call (301) 648-3181 or start your project online. Expanding the kitchen itself? See our home additions in Maryland — bump-outs are one of the most cost-effective ways to gain kitchen space.